Qazvin- Zanjan Freeway Project, Lots 4 and 5
Client: Ministry of Road & Transportation– Head Quarter of Freeway Construction
Consultant: Polrood Consulting Engineers
Current Condition: Accomplished
Project Location: Zanjan
Contract Type: C
Initiation Date: May 1990
Completion Date: 1996
Main Specifications of the Project:
- Earth work including cut and fill volume of 4,000,000 m3
- Executing concrete and stone volume of 150,000 m3
- Executing base and sub-base volume of 550,000.m3
- Executing asphalt volume of 700,000 tons
- Executing steel Bridges on rivers including 3 spans x25 m
- Constructing 2 bridges and entrance & exit loop ramps for Abhar – Khorramdarreh cities
- Constructing 8 grand bridges with 10-12 meters spans
- Constructing 150 bridges and culverts
Sabzevar-Bardeskan Road, Lot 1 A & B
Client: Ministry of Road & Transportation– Roads Construction and Development Plans Deputy
Consultant: Rah Ahan Rah Consulting Engineers
Current Condition: Accomplished
Project Location: North Khorasan Province
Contract Type: C
Initiation Date: Jan, 1990
Completion Date: 1996
Main Specifications of the Project:
60 kilometers of road with the final width of 9 meters, which includes the following works:
- Earth work including cut and fill volume of 3,000,000 m3
- Executing concrete and stone work volume of 150,000 m3
- Executing base and sub-base volume of 100,000 m3
- Executing asphalt volume of 170,000 tons
- Constructing one grand bridge on the river including 11 spans x 20 m
- Constructing 150 bridges and culverts
Sabzevar- Bardeskan Road , Lot 2
Client: Ministry of Road & Transportation– Road Construction and Development Plans Deputy
Consultant: Rah Ahan Rah Consulting Engineers
Current Condition: Accomplished
Project Location: Khorasan Razavi Province
Contract Type: C
Initiation Date: March, 1991
Completion Date: 2001
Main Specifications of the Project:
70 kilometers of road with the final width of 9 meters, which includes the following works:
- Earth work including cut and fill volume of 4,000,000 m3
- Executing concrete and stone work volume of 150,000 m3
- Executing base and sub-base volume of 180,000 m3
- Executing asphalt volume of 250,000 tons
- Constructing one grand bridge including 4 spans x 12 m
- Constructing 200 bridges and culverts
Rostam Abad – Bazman- Iranshahr Road Improvement and Widening Project, Lot 2
Client: Ministry of Road & Trnsportation– Roads Construction and Development Plans Deputy
Consultant: Rah Ahan Rah Consulting Engineers
Current Condition: Accomplished
Project Location: Sistan and Balouchestan Province
Contract Type: C
Initiation Date: 2003
Completion Date: 2009
Main Specifications of the Project:
115 kilometers of road with the final width of 11 meters, which includes the following works:
- Earth work including cut and fill volume of 3,238,000 m3
- Executing concrete and stone work volume of 68,000 m3
- Executing base and sub-base volume of 210,000 m3
- Executing asphalt volume of 175,000 tons
- Constructing 140 bridges and culverts
Baghcheh – Neishabour Road Project, Second Lane, Lot 2
Client: Ministry of Road & Transportation– Roads Construction and Development Plans Deputy
Consultant: Rah Ahan Rah Consulting Engineers
Current Condition: Accomplished
Project Location: Khorasan Razavi Province
Contract Type: C
Initiation Date: April, 2002
Completion Date: 2007
Main Specifications of the Project:
45 kilometers of road with the final width of 12 meters, which includes the following works:
- Earth work including cut and fill volume of 2,000,000 m3
- Executing of concrete and stone work volume of 80,000 m3
- Executing base and sub-base volume of 165,000 m3
- Executing asphalt volume of 200,000 tons
- Constructing 5 grand bridges including spans of 10-14 m
- Constructing 260 bridges and culverts
Miamei – Sabzevar Road Improvement Project
Client: Roads and Urban Planning Administration of Khorasan Razavi – Iran Road Maintenance & Transportation Organization
Consultant: Gostareshe Rah & Abniye Shargh Consulting Engineers, Pasar
Project Location: between Khorasan and Semnan Province
Contract Type: C
Initiation Date: 2006
Contract Period: 102 Months
Main Specifications of the Project:
180 kilometer of road with the final width of 11 meters, which includes the following works:
- Earth work including cut and fill volume of 1,000,000 m3
- Executing concrete and stone work volume of 16,000 m3
- Executing base and sub-base volume of 440,000 m3
- Minor asphalt repair with the volume of 160,000 tons
- Executing asphalt volume of 700,000 tons
Total volume of excavation operations (excavation and embankment)
Total volume of concreting operations
Total volume of asphalt run
Number of completed projects
Number of projects under implementation
Sari- Neka – Behshahr Highway plus Neka and Behshahr Bypass Project
Client: Ministry of Road & Transportation– Road Construction and Development Plans Deputy
Consultant: Hegza Consulting Engineers
Current Condition: Accomplished
Project Location: Mazandaran Province
Contract Type: C
Initiation Date: March, 1997
Completion Date: 2008
Main Specifications of the Project:
48 kilometers of road the final width of 25.6 meters, which includes the following works:
- Earth work including cut and fill volume of 3,000,000 m3
- Executing concrete and stone work volume of 300,000 m3
- Executing base and sub-base volume of 600,000 m3
- Executing asphalt volume of 600,000 tons
- Constructing 3 bridges and enter & exit loop ramps for Neka and Behshahr bypasses
- Constructing a bridge on the valley including 10 spans x 20m and one on the river including 8 spans x 20m
- Constructing grand bridges including spans of 15-20 m
- Constructing 200 bridges and culverts
Gonabad – Khezri – Birjand Asphalt Coating Project
Client: Ministry of Road & Transportation– Road & Transportation Administration of Khorasan Razavi
Consultant: Asas Rah Consulting Engineers
Current Condition: Accomplished
Project Location: South Khorasan Province
Contract Type: C
Initiation Date: 2003
Completion Date: 2005
Main Specifications of the Project:
- Execution of Asphalt Coating with the length of 25 kilometers from 11+000 Km to 136+000 Km plus road marking
- Executing aphalt volume of 144,000 tons
Shadmehr – Gonabad – Khezri – Birjand Asphalt Coating, Lot 2
Client: Ministry of Road & Transportation– Road & Transportation Administration of Birjand
Consultant: Asas Rah Consulting Engineers
Current Condition: Successfully completed
Project Location: South Khorasan Province
Contract Type: C
Initiation Date: 2001
Contract Period: 36 Months
Main Specifications of the Project:
- Execution of Asphalt Coating with the length of 73 kilometers from 0+000 Km to 73+000 Km plus road marking
- Executing asphalt volume of 318,000 tons
Neishabour – Sabzevar , Sabzevar Hokmabad Road Pavement and Asphalt Repair Project
Client: Roads and Urban Planning Administration of Khorasan Razavi
Location: Khorasan Razavi Province
Contract Type: C
Initiation Date: March, 2014
Contract Period: 20 Months
Main Specifications of the Project:
- Executive Length of 225 Km
- Executing seal coat volume of 5,000 tons
- Executing asphalt volume of 106,000 tons
Kavar-Firouzabad Road Infrastructure Project, Lot 3 , Second Lane
Client: Construction and Development of Transportation Infrastructures Company- Construction and Development of South Country Roads Administration
Consultant: Farashar Asia Consulting Engineers
Current Condition: In progress
Project Location: Fars Province
Contract Type: C
Initiation Date: Jan, 2017
Main Specifications of the Project:
- 6 tunnels with total length of 3416 m
- Number of culverts: 38
- Total length of retaining walls: 850 m
- Total length of galleries: 80 m
- Cut earth works: 1,140,000 m³
- Fill earth works: 233,000 m³
- Volume of concrete works: 147,500 m³
- Tunnel excavation: 294,000 m³
Some Other Projects in brief:
- Robat- Gharbil- Garmeh- Jajarm Road Construction Project
Length of the Project: 120 Km Project Location: North Khorasan Province
- Sabzehvar – Neyshabour Road Construction Project
Length of the Project: 50 Km Project Location: Razavi Khorasan Province
- Sabzehevar- Hokmabad Road Pavement and Asphalt Repair Project
Length of the Project: 45 Km Project Location: Razavi Khorasan Province
- Mashhad- Neyshabour Road Construction Project Lot 60 and Neishabour-Mashhad Asphalt Paving Project Lot 61
Length of the Project: Km Project Location: Razavi Khorasan Province
- Neyshabour Bypass Road Construction Project
Length of the Project: 14 Km Project Location: Razavi Khorasan Province
- Dolatabad-Neishabour Intersection Construction Project
Length of the Project: Km Project Location: Razavi Khorasan Province
- Shahliz – Azadshahr – Jangal Golestan Road Construction Project Lot 5
Length of the Project: Km Project Location: Golestan Province
- Tirage Machine Company
- Tirage Diesel Company
- Kian Panel Company
- Tirage Sazeh Company
List of The Links for Tirage Group Companies
Direct Access