Client: Ministry of Road & Transportation– Construction and Development of Railways, Ports and Airports Deputy
Consultant: Ettehad Rah Consulting Engineers
Current Condition: Accomplished
Project Location: Fars Province
Contract Type: C
Initiation Date: 2010
Contract Period: 48 Months
Main Specifications of the Project:
Design and execution of 40.5 km railway with the final width of 11 meters, in which there is about 3.3 km tunneling including the following works:
- Earth work including cut and fill volume of 4,820,000 m3
- Tunnel excavation volume of 273,000 m3
- Executing concrete and stone work volume of 210,000 m3
- Executing base and sub-base volume of 182,800 m3
- Tunnel lining volume of 90,000 m3
- Constructing 2 grand bridges including 5 spans x 20 m
- Constructing 4 grand bridges including 10 m spans
- Constructing 140 bridges and culvert
Client: Ministry of Road & Transportation– Construction and Development of Railways, Ports and Airports Deputy
Consultant: Haraz Rah Consulting Engineers
Current Condition: Under construction
Project Location: Qazvin Province
Contract Type: C
Initiation Date: 2006
Contract Period: 28 Months
Main Specifications of the Project:
Design and execution of 16 km railway with the final width of 11.71 meters, in which there is about 5.8 km tunnel excavation including the following works:
- Earth work including cut and fill volume of 1,450,000 m3
- Tunnel excavation volume of 675,000 m3
- Executing concrete and stone work volume of 325,000 m3
- Executing base and sub-base volume of 43,000 m3
- Tunnel lining volume of 260;000 m3
- Constructing 3 grand bridges up to 36 meters height with total length of 996 m
Client: Ministry of Road & Transportation– Construction and Development of Railways, Ports and Airports Deputy
Main Specifications of the Project:
The length of operation is 25 kilometers including the following works:
- Earth work including cut and fill volume of 2,400,000 m3
- Executing concrete and stone work volume of 58,000 m3
- Constructing 2 grand bridges with total length of 92 m
- Constructing 3 train underpass boxes
Client: Construction and Development of Transportation Infrastructures Company- Construction and Development of Railways, Ports and Airports Deputy
Consultant: Iran Oston Consulting Engineers
Current Condition: In progress
Project Location: Gilan Province
Contract Type: C
Initiation Date: Jul, 2020
Main Specifications of the Project:
- Total length of rail parts supply and installation: 63 km
- Number of stations: 2
- In-station railroad length: 23 km
- Railroad route length: 40 km