Isfahan – Shiraz Railway Project Lot 5: Substructure
Client: Ministry of Road & Transportation– Construction and Development of Railways, Ports and Airports Deputy
Consultant: Ettehad Rah Consulting Engineers
Current Condition: Accomplished
Project Location: Fars Province
Contract Type: C
Initiation Date: 2010
Contract Period: 48 Months
Main Specifications of the Project:
Design and execution of 40.5 km railway with the final width of 11 meters, in which there is about 3.3 km tunneling including the following works:
- Earth work including cut and fill volume of 4,820,000 m3
- Tunnel excavation volume of 273,000 m3
- Executing concrete and stone work volume of 210,000 m3
- Executing base and sub-base volume of 182,800 m3
- Tunnel lining volume of 90,000 m3
- Constructing 2 grand bridges including 5 spans x 20 m
- Constructing 4 grand bridges including 10 m spans
- Constructing 140 bridges and culvert
Qazvin – Rasht – Bandar Anzali Railway Project Lot 2/B : Substructure
Client: Ministry of Road & Transportation– Construction and Development of Railways, Ports and Airports Deputy
Consultant: Haraz Rah Consulting Engineers
Current Condition: Under construction
Project Location: Qazvin Province
Contract Type: C
Initiation Date: 2006
Contract Period: 28 Months
Main Specifications of the Project:
Design and execution of 16 km railway with the final width of 11.71 meters, in which there is about 5.8 km tunnel excavation including the following works:
- Earth work including cut and fill volume of 1,450,000 m3
- Tunnel excavation volume of 675,000 m3
- Executing concrete and stone work volume of 325,000 m3
- Executing base and sub-base volume of 43,000 m3
- Tunnel lining volume of 260;000 m3
- Constructing 3 grand bridges up to 36 meters height with total length of 996 m
Total volume of excavation operations (excavation and embankment)
Total volume of concreting operations
Total tunnel excavation volume
Total Lining Tunnel
Number of projects under implementation
Esfarayen Railway Connection to the Railway Network of Iran Lot1 : Substructure
Client: Ministry of Road & Transportation– Construction and Development of Railways, Ports and Airports Deputy
Main Specifications of the Project:
The length of operation is 25 kilometers including the following works:
- Earth work including cut and fill volume of 2,400,000 m3
- Executing concrete and stone work volume of 58,000 m3
- Constructing 2 grand bridges with total length of 92 m
- Constructing 3 train underpass boxes
Rasht-Anzali Railway pavement and Material Supply Project
Client: Construction and Development of Transportation Infrastructures Company- Construction and Development of Railways, Ports and Airports Deputy
Consultant: Iran Oston Consulting Engineers
Current Condition: In progress
Project Location: Gilan Province
Contract Type: C
Initiation Date: Jul, 2020
Main Specifications of the Project:
- Total length of rail parts supply and installation: 63 km
- Number of stations: 2
- In-station railroad length: 23 km
- Railroad route length: 40 km